Products - Cooling

Unidyne Logo

Case Study of Energy Saving with MAX

PUNE :

Consider TFA requirement of 3000 CFM
No.of hours of operation 12 hrs/ day
1 TR of cooling requires 1.2 kW

All cooling load calculations arrived at considering weather data on an hourly basis throughout the year.

3000 TFA CFM Conventional TFA Unidyne LEC MAXFLOW TFA Savings
Installed TR 21 TR 6 TR > 70%
Annualized  required refrigeration  load 87,500 TR 26000 TR > 70%
Annualized required power load 105 MW 31 MW 74 MW

Monetary Savings of 74 MW @ Rs 10/kw = Rs 740,000
MaxFlow TFA 3000 CFM Cost = Rs 600,000

 

 

 

  • Contact
  • Careers
  • Enquiry
  • Sitemap